3. While performing the full load test required by Clause 11.3, conduct an infrared thermal imaging assessment of all electrical connections, contacts, and energized components.
4. Correct all defects found during inspections and tests.
5. Record all inspections, tests, and corrective actions in the log (see Clause 11.5.3).
Note: Items 1 to 5 require special skill and shall be carried out by a qualified contractor, the system manufacturer, or individuals trained and certified by the system manufacturer.